小蓝视频

Skip to content

Musqueam, Fortis小蓝视频 ink deal on Tilbury LNG expansion

Agreement provides equity option for Musqueam First Nation in liquefied natural gas export terminal
A Tilburyphase2artistrendering-fortisbc
Artist's rendering of the Tilbury Island LNG facility after expansion, with additional storage tank. | Fortis小蓝视频

Fortis小蓝视频 and the Musqueam Indian Band have signed an agreement on the Tilbury Island LNG plant, which Fortis小蓝视频 is planning to spend billions expanding to serve a growing demand for marine bunkering and liquefied natural gas exports.

It’s not clear just how much of an equity stake the Musqueam could end up owning in the project, which when fully expanded could produce up to 3.5 million tonnes on LNG annually – almost twice the production capacity of the Woodfibre LNG project in Squamish.

“The agreement is a framework for the Musqueam to acquire equity ownership in these expansion projects, and the level of equity is dependent on a variety of factors, including project investment decisions,” Doug Slater, Fortis小蓝视频’s vice president of external and indigenous relations, told BIV News.

“Through our relationship with Fortis小蓝视频, we are ensuring benefits for future generations,” Musqueam Chief Wayne Sparrow said in a news release.

Fortis小蓝视频 has been producing liquefied natural gas (LNG) at its Tilbury Island plant in Delta since 1971. It was built to store natural gas for peaking and emergency backup purposes.

It came in handy in the fall of 2018 when an Enbridge Inc. natural gas pipeline ruptured, interrupting the flow of natural gas to the Lower Mainland. Fortis小蓝视频’s LNG storage capacity at Tilbury Island allowed British Columbians to continue heating their homes while the pipeline was being fixed.

In 2019, Fortis小蓝视频 completed a $400 million expansion of the plant’s production and storage capacity, and announced a second phase expansion – one that includes a new marine jetty to be used to load LNG carriers for export, and marine bunkering vessels.

The expansion was last estimated to have a capital cost of $3 billion.

The Tilbury Island marine jetty is currently in its own federal and provincial environmental review processes, expected to conclude by the end of this year. The phase 2 plant expansion is moving through separate federal and environmental reviews.

Should both the marine jetty and LNG plant expansion get federal and provincial approval, Fortis小蓝视频 hopes to see the marine jetty under construction in 2023 and operational by 2024.

The jetty is an important part of Fortis小蓝视频’s ambitions of making Vancouver a LNG marine bunkering hub, as vessels switch from bunker fuel and diesel to cleaner fuels like natural gas. Natural gas generally produces fewer CO2 emissions, sulphur dioxide, nitrogen oxide and particulates than bunker fuel or diesel.

In addition to the Tilbury marine jetty, the Tilbury Island expansion would require additional LNG production capacity and storage. The LNG production would use electric drive, which reduces its overall CO2 emissions.

The expansion could result in 137 vessels -- 68 LNG carriers and 69 bunker vessels – fueling up at Tilbury Island, and 274 vessel movements, according to a project description.

Tilbury Phase 2 would increase the facility’s LNG production capacity by up 2.6 million tonnes of LNG annually -- bringing total production capacity to about 3.5 million tonnes -- and includes a second storage tank with storage capacity of 142,000 cubic metres.

“That’s to back up the gas system in the Lower Mainland and strengthen the reliance of our system during the cold winter periods and any disruption to the gas system,” Slater said of the additional storage tank.

The expansion in production capacity is needed, Fortis小蓝视频 says, to provide more security for domestic customers, and to serve growing LNG export markets and demand for LNG marine bunkering.

Currently, Fortis小蓝视频 uses truck-to-ship fueling for those vessels, like ferries, that now run on natural gas. The marine jetty would allow for ship-to-ship fueling. The marine jetty would have one berth for LNG carriers for LNG exports, and a berth for marine bunkering vessels. These bunkering vessels would fill up with LNG, and then travel to wherever a large vessel, like a cargo ship or cruise ship, is moored to refuel it.

Slater said construction of the phase 2 expansion could begin as early as 2023, should all environmental certificates be approved, and completed by 2028.

push icon
Be the first to read breaking stories. Enable push notifications on your device. Disable anytime.
No thanks